Intron has successfully transferred the existing system infrastructure to the FC SAN infrastructure with Data Storage System project at Bartin University.
Customer:
Bartin University
Project:
Data Storage System
Intron has successfully transferred the existing system infrastructure to the FC SAN infrastructure with Data Storage System project at Bartin University.
Bartin University
Data Storage System